Case Studies | Gavi Developments Limited

Our case studies give a flavour of the types of projects our team has undertaken in the past and will undertake at Gavi Developments.

Case Study 1

Prayer/Community Building

Hampshire
Completed 2015

New building designed to maximise a tight, awkward shaped site. The architectural language draws from that of the significantly smaller former Victorian chapel that had previously occupied the site.

Case Study 2

Commercial Office

Chandlers Ford
Completed 2020

New build standalone office building to replace a substantially smaller time-expired office building. The design was developed to maximise the awkwardly shaped site and delivered on budget. The building was quickly let on a long-term lease to Guide Dogs UK (Southampton Community team)

Case Study 3

Case Study 4

Barn Extension

Extension and development of a 150sq meters Grade 2 listed Barn towards a holiday let accommodating 5 people.

This is a current project and will be finished in September 2026.

FAQ